Brentwood Prep Incipe 2019
Brentwood School Preparatory 28 Building the future These are extremely exciting times at Brentwood Prep and the development programme is very much underway. The demolition of the Art and DT rooms in the Stable Block was achieved with minimum fuss and the wonderful Garden Building was erected over the summer in time for us to make it ready for the children to enjoy all it has to offer from the beginning of the Michaelmas Term. The pupils were asked by our contractors to name the towering crane which hangs over us, and they came up with….Boris! The new structures will provide us with wonderful facilities and allow us to make great strides in many academic areas. This development safeguards the Prep for future generations; thank you for your patience during the course of the works, the finished result of which will be ready for September 2020.
Made with FlippingBook
RkJQdWJsaXNoZXIy MTA4ODM=